Recent Planning Applications

37 Granary Lane Budleigh Salterton Devon EX9 6EP

9th April 2024

Erection of a timber framed open Car Port structure in front of the existing garage

Lily Farm Vineyard Dalditch Lane Budleigh Salterton EX9 7AH

3rd April 2024

Construction of managers' accommodation and extension to Lily Farm Vineyard business premises

11 Northview Road Budleigh Salterton EX9 6BZ

26th March 2024

Discharge of conditions for 20/0655/FUL : Condition 3 (materials)

Longboat Cafe Marine Parade Budleigh Salterton Devon EX9 6NS

26th March 2024

Proposed extension with retractable roof and walls.

16 Granary Lane Budleigh Salterton EX9 6JD

11th March 2024

Single-storey rear extension.

8 Vision Hill Road Budleigh Salterton EX9 6EB

4th March 2024

Proposed single storey rear extension

4 Swains Road Budleigh Salterton EX9 6HZ

20th February 2024

Annexe extension

21 Clinton Terrace Budleigh Salterton EX9 6RY

12th February 2024

Discharge of conditions for 23/2147/FUL: Condition 3 (Materials) Condition 4 (Landscaping)

20 Fore Street Budleigh Salterton Devon EX9 6NG

7th February 2024

T1, hawthorn - fell. Reason - dead buds and suspected root death due to honey fungus.

5A Northview Road Budleigh Salterton Devon EX9 6BY

5th February 2024

T7 - Cherry: reduce crown height by up to 4m and lateral spread by up to 3m, ensuring a minimum clearance of 2m from property. Maximum Diameter of Cuts 50mm. Crown lift to 2.5m above ground level, MDC 25mm. Rationale: This Cherry tree is now quite large an

3 Fore Street Hill Budleigh Salterton EX9 6NW

29th January 2024

T1 - Holm Oak: remove approximately 3 number of branches to provide sufficient clearance (approximately 1.5-2m) to adjacent service cable & property.

8 West Hill Budleigh Salterton EX9 6BW

24th January 2024

T1, False Acacia: Prune side growth by approximately 1m to a suitable side branch and reduce height by approximately 1m to leave a natural form.

63 Moormead Budleigh Salterton EX9 6PR

11th January 2024

Demolition of outbuilding and construction of single storey extension on north elevation. PV panels on east and west roof elevations.

10A Northview Road Budleigh Salterton EX9 6BZ

10th January 2024

Demolish garage and construct a new ancillary annexe

Palmer Mews Victoria Place Budleigh Salterton Devon EX9 6JJ

8th January 2024

Silver Birch - fell.

Hollybank 1A Sherbrook Hill Budleigh Salterton Devon EX9 6DA

3rd January 2024

T1 Beech - r educe crown by up-to 3m to leave a finished height of 9m, reshape and consolidate the crown to leave a balanced appearance.

25 Jocelyn Road Budleigh Salterton Devon EX9 6SF

15th December 2023

Proposed conservatory to rear of property.

Archbrook Lodge 1A Station Road Budleigh Salterton EX9 6RH

13th December 2023

T1, Holm Oak: lift aspect of crown of tree above road to approximately 5.5m above ground level.

9 Stoneborough Lane Budleigh Salterton EX9 6HL

5th December 2023

Earth Works to Front Garden to provide New Parking Space

Nutchatches 21 Exmouth Road Budleigh Salterton EX9 6AQ

4th December 2023

Copper beech: fell.

Shire House Cricket Field Lane Budleigh Salterton Devon EX9 6PB

4th December 2023

Construction of boundary wall on western elevation with associated excavations

1A Arden Close Budleigh Salterton Devon EX9 6JG

28th November 2023

T1: Cherry - fell and replace with another tree (variety to be agreed with planning).

42 Honey Park Road Budleigh Salterton EX9 6EG

15th November 2023

Demolition of existing garage and construction of single storey annex on west elevation. Proposed new garage with loft store. Ground floor rear single storey extension, extended first floor dormer. New render on external walls.

7 Cliff Terrace Budleigh Salterton EX9 6JY

13th November 2023

T1 - Group of 4+1 sycamores - reduce crowns to a height of 8m (to previous cuts). T2 - x2 Pear trees - remove 25% of new growth since last permission and the remaining 75% cut to lowest buds. T3 - Silver birch - reduce crown height to 5.5m and width to 4m.

Flat 1 24 West Hill Budleigh Salterton Devon EX9 6BS

26th October 2023

T1, Holm Oak : crown reduce to existing pollards points approximately 3.5-4m above ground level. Reduce all aspects of tree to leave a balanced shape to allow a new crown formation. Maximum diameter of cuts 50mm.